SOLAR Β· OPERATIONAL

Bicker Fen

Bicker Fen is a 22.6 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England

Key facts

Installed capacity
22.6 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE24 5AZ
Coordinates
53.1475, 0.1918

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bicker Fen compares

41st of 662largest solar farms in the UK register
7th of 95in East Midlands
0.40%of listed UK solar farms capacity
β‰ˆ 20 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 22.6 MW station would generate roughly 20 GWh of electricity in a year, similar to the annual use of about 7,320 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bicker Fen (previously Manor Farm)
Developer / operator
Innova Renewables Limited
Planning authority
East Lindsey
Planning reference
S/051/00772/17
Application submitted
2 May 2017
Permission granted
30 November 2017
Began operating
12 March 2024
Capacity in planning record
22.6 MW
Address
Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness, Lincolnshire, PE24 5AY
REPD reference
1694

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026