Lynn Wind Farm
Lynn Wind Farm is a 97.2 MW offshore wind farm in East Midlands England, operated by XceCo. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Offshore
- East Midlands
- England
Key facts
- Installed capacity
- 97.2 MW
- Status
- Operational
- Technology
- Wind Β· Offshore
- Operator
- XceCo
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 53.1356, 0.4515
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Lynn Wind Farm compares
At a typical UK load factor for this technology (about 38% of the maximum possible output), a 97.2 MW station would generate roughly 324 GWh of electricity in a year, similar to the annual use of about 119,840 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in East Midlands All run by XceCoNearby generating sites
- Inner Dowsing Wind Farm Β· 97.2 MW offshore wind farm5.8 km
- Lincs Β· 270 MW offshore wind farm6.2 km
- Race Bank Β· 573 MW offshore wind farm9.2 km
- Dudgeon BMU 1 Β· 108 MW offshore wind farm11.0 km
- Dudgeon BMU 2 Β· 90 MW offshore wind farm11.0 km
- Dudgeon BMU 3 Β· 102 MW offshore wind farm11.0 km
- Dudgeon BMU 4 Β· 102 MW offshore wind farm11.0 km
- The Hollies Β· 2.6 MW onshore wind farm14.1 km
Also operated by XceCo
XceCo operates 2 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Lynn
- Developer / operator
- XceCo
- Planning authority
- DECC (S36)
- Application submitted
- 29 October 2003
- Permission granted
- 14 August 2004
- Construction started
- 1 March 2008
- Began operating
- 15 March 2008
- Capacity in planning record
- 97.2 MW
- Address
- 5.2km SkegnessΒ , Offshore
- REPD reference
- 2493
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.