SOLAR Β· OPERATIONAL

SPD 3 - Grange Farm

SPD 3 - Grange Farm is a 9.5 MW solar farm in East Midlands England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningJul 2014 (completed)
  2. ConsentedSep 2014 (completed)
  3. ConstructionFeb 2015 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
9.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
RES Group
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
53.1440, -0.1605

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How SPD 3 - Grange Farm compares

156th of 662largest solar farms in the UK register
28th of 95in East Midlands
0.17%of listed UK solar farms capacity
β‰ˆ 8.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 9.5 MW station would generate roughly 8.3 GWh of electricity in a year, similar to the annual use of about 3,080 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Grange Farm (Kirkby on Bain)
Developer / operator
Solar Park Developments
Planning authority
East Lindsey
Planning reference
S/094/01115/14
Application submitted
1 July 2014
Permission granted
30 September 2014
Construction started
1 February 2015
Began operating
30 March 2015
Capacity in planning record
9 MW
Address
and at Grange Farm, Kirkby Lane, Kirkby-on-Bain, Woodhall Spa, Lincolnshire, LN10 6YY, Lincolnshire, LN10 6YY
REPD reference
2140

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026