Fen Farm Solar is a 0.9 MW solar farm in East Midlands England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 0.9 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Ecotricity
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- LN11 7BP
- Coordinates
- 53.4233, 0.0690
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Fen Farm Solar compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 0.9 MW station would generate roughly 0.8 GWh of electricity in a year, similar to the annual use of about 290 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by EcotricityNearby generating sites
- Fen Farm Β· 16 MW onshore wind farm0.0 km
- Yarburgh Β· 8.09 MW solar farm3.8 km
- Bishopthorpe Β· 16.4 MW onshore wind farm10.7 km
- High Leas PV Β· 4.88 MW solar farm11.6 km
- Bambers Β· 9.6 MW onshore wind farm15.7 km
- Mablethorpe Β· 1.2 MW onshore wind farm16.0 km
- Laceby CIC1 Β· 5 MW solar farm18.4 km
- Laceby CIC2 Β· 5 MW solar farm18.4 km
Also operated by Ecotricity
Ecotricity operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Fen Farm Solar Park
- Developer / operator
- Ecotricity
- Planning authority
- East Lindsey
- Planning reference
- N/036/01536/10
- Application submitted
- 13 August 2010
- Permission granted
- 12 November 2010
- Began operating
- 11 July 2011
- Capacity in planning record
- 1 MW
- Address
- Fen Farm, Fen Lane, Conisholme, South Lincolnshire, Lincolnshire
- REPD reference
- 1018
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.