SOLAR Β· OPERATIONAL

Fen Farm Solar

Fen Farm Solar is a 0.9 MW solar farm in East Midlands England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningAug 2010 (completed)
  2. ConsentedNov 2010 (completed)
  3. Construction (completed)
  4. OperatingJul 2011 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
0.9 MW
Status
Operational
Technology
Solar Β· PV
Operator
Ecotricity
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LN11 7BP
Coordinates
53.4233, 0.0690

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Fen Farm Solar compares

649th of 662largest solar farms in the UK register
93rd of 95in East Midlands
0.02%of listed UK solar farms capacity
β‰ˆ 0.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 0.9 MW station would generate roughly 0.8 GWh of electricity in a year, similar to the annual use of about 290 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Ecotricity

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Fen Farm Solar Park
Developer / operator
Ecotricity
Planning authority
East Lindsey
Planning reference
N/036/01536/10
Application submitted
13 August 2010
Permission granted
12 November 2010
Began operating
11 July 2011
Capacity in planning record
1 MW
Address
Fen Farm, Fen Lane, Conisholme, South Lincolnshire, Lincolnshire
REPD reference
1018

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.