WIND Β· OPERATIONAL

Bristol Port

Bristol Port is a 6 MW onshore wind farm in South West England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • South West
  • England
Project stageOperating
  1. PlanningAug 2005 (completed)
  2. ConsentedDec 2005 (completed)
  3. Construction (completed)
  4. OperatingAug 2007 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
6 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Ecotricity
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BS11 9DQ
Coordinates
51.5119, -2.7088

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bristol Port compares

394th of 488largest wind farms in the UK register
11th of 19in South West
0.02%of listed UK wind farms capacity
β‰ˆ 14 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,060 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in South West All run by Ecotricity

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Avonmouth Port
Developer / operator
Bristol Port Authority
Planning authority
Bristol, City of
Planning reference
05/03131/F
Application submitted
8 August 2005
Permission granted
16 December 2005
Began operating
20 August 2007
Capacity in planning record
6 MW
Address
Avonmouth Port, Avon
REPD reference
3194

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.