Dagenham
Dagenham is a 5.9 MW onshore wind farm in London, England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- London
- England
Key facts
- Installed capacity
- 5.9 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Ecotricity
- Region
- London
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- RM9 6SA
- Coordinates
- 51.5133, 0.1646
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Dagenham compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 5.9 MW station would generate roughly 13 GWh of electricity in a year, similar to the annual use of about 4,980 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in London All run by EcotricityNearby generating sites
- Crossness Β· 1.5 MW solar farm2.0 km
- Beckton Β· 0.45 MW solar farm4.9 km
- Riverside - Energy from Waste Β· 80 MW energy-from-waste plant6.0 km
- Cranham Β· 3 MW solar farm9.8 km
- Tilbury B Power Station Β· 1,050 MW coal-fired power station14.7 km
- SELCHP Β· 35 MW energy-from-waste plant15.1 km
- Coryton Energy Company Ltd Β· 800 MW CCGT gas power station15.1 km
- Fairwinds Β· 12.2 MW solar farm16.6 km
Also operated by Ecotricity
Ecotricity operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Ford Wind Park - Dagenham
- Developer / operator
- Ecotricity
- Planning authority
- Barking and Dagenham
- Planning reference
- DC/03/00/201
- Application submitted
- 7 March 2003
- Permission granted
- 16 July 2003
- Began operating
- 17 June 2004
- Capacity in planning record
- 5.9 MW
- Address
- Ford Motor Company Estate Kent Avenue Dagenham, London
- REPD reference
- 3158
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.