SELCHP

SELCHP is a 35 MW energy-from-waste plant in London, England, operated by Veolia. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Bioenergy
  • London
  • England
  • Combined heat and power
Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 1993 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
35 MW
Status
Operational
Technology
Bioenergy
Operator
Veolia
Region
London
Country
England
Grid connection (DUKES)
LV
Combined heat & power
Yes
Postcode
SE14 5RS
Coordinates
51.4859, -0.0484

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How SELCHP compares

7th of 7largest energy-from-waste plants stations in the UK register
3rd of 3in London
7.4%of listed UK energy-from-waste plants capacity

Energy-from-waste plants burn residual household and commercial waste that cannot be recycled, using the heat to generate electricity and sometimes heat for nearby buildings.

All energy-from-waste plants Power stations in London

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
SELCHP ERF
Developer / operator
Veolia (SELCHP)
Planning authority
Lewisham
Began operating
1 December 1993
Capacity in planning record
35 MW
Address
Landmann Way, New Cross, Lewisham, London, SE14 5RS
REPD reference
4928

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.