SOLAR Β· OPERATIONAL

Fairwinds

Fairwinds is a 12.2 MW solar farm in East of England, England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningJun 2013 (completed)
  2. ConsentedNov 2013 (completed)
  3. ConstructionJun 2014 (completed)
  4. OperatingSep 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12.2 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SS16 6EB
Coordinates
51.5641, 0.3896

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Fairwinds compares

103rd of 662largest solar farms in the UK register
24th of 76in East of England
0.22%of listed UK solar farms capacity
β‰ˆ 11 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12.2 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 3,960 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Fairwind Farm
Developer / operator
MS Power Projects Ltd
Planning authority
Thurrock
Planning reference
13/00543/FUL
Application submitted
10 June 2013
Permission granted
25 November 2013
Construction started
23 June 2014
Began operating
30 September 2014
Capacity in planning record
10 MW
Address
Fairwind Farm Lower Dunton Road Laindon Essex, Essex
REPD reference
1763

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.