πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Cranham

Cranham is a 3 MW solar farm in London, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • London
  • England
Project stageOperating
  1. PlanningJun 2014 (completed)
  2. ConsentedAug 2015 (completed)
  3. ConstructionSep 2016 (completed)
  4. OperatingDec 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
London
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
RM14 3NU
Coordinates
51.5604, 0.2837

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Cranham compares

580th of 662largest solar farms in the UK register
1st of 3in London
0.05%of listed UK solar farms capacity
β‰ˆ 2.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3 MW station would generate roughly 2.6 GWh of electricity in a year, similar to the annual use of about 970 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in London All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Cranham Golf Course Solar Park
Developer / operator
Cranham Golf Course
Planning authority
Havering
Planning reference
P0907.14
Application submitted
27 June 2014
Permission granted
13 August 2015
Construction started
21 September 2016
Began operating
21 December 2016
Capacity in planning record
2.6 MW
Address
Cranham Golf Course St. Marys Lane Upminster, London
REPD reference
2117

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.