SOLAR Β· OPERATIONAL

Dalby Solar

Dalby Solar is a 6.88 MW solar farm in East Midlands England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningFeb 2016 (completed)
  2. ConsentedMay 2016 (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
6.88 MW
Status
Operational
Technology
Solar Β· PV
Operator
Ecotricity
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LE14 3LY
Coordinates
52.8023, -1.0392

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Dalby Solar compares

194th of 662largest solar farms in the UK register
32nd of 95in East Midlands
0.12%of listed UK solar farms capacity
β‰ˆ 6.0 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 6.88 MW station would generate roughly 6.0 GWh of electricity in a year, similar to the annual use of about 2,230 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Ecotricity

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Planning Permission Expired
Site name in planning record
Old Dalby Lodge Farm
Developer / operator
Ecotricity
Planning authority
Melton
Planning reference
16/00078/FUL
Application submitted
5 February 2016
Permission granted
12 May 2016
Capacity in planning record
5 MW
Address
Field No 0006, Paddys Lane, Old Dalby, Melton Mowbray, Leicestershire, LE14 3LY
REPD reference
5759

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026