Six Hills
Six Hills is a 18.7 MW solar farm in East Midlands England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 18.7 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- LE14 3PR
- Coordinates
- 52.7849, -1.0626
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Six Hills compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 18.7 MW station would generate roughly 16 GWh of electricity in a year, similar to the annual use of about 6,080 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by Octopus InvestmentsNearby generating sites
- Wymeswold - Wide Lane Β· 4.28 MW solar farm1.9 km
- Dalby Β· 7.29 MW onshore wind farm2.3 km
- Dalby Solar Β· 6.88 MW solar farm2.5 km
- Wymeswold Β· 2.13 MW solar farm3.9 km
- Asfordby B Β· 4.98 MW solar farm9.3 km
- Asfordby A Β· 4.91 MW solar farm11.2 km
- Ratcliffe (OCGT) Β· 34 MW oil-fired power station14.8 km
- Cotgrave Β· 4.98 MW solar farm14.8 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Six Hills Solar Farm
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Melton
- Planning reference
- 14/00529/FUL
- Application submitted
- 27 June 2014
- Permission granted
- 16 October 2014
- Construction started
- 16 December 2014
- Began operating
- 24 March 2015
- Capacity in planning record
- 18.7 MW
- Address
- Field OS 00077 And 6867 Six Hills Road Ragdale, Leicestershire
- REPD reference
- 2057
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.