SOLAR Β· OPERATIONAL

Six Hills

Six Hills is a 18.7 MW solar farm in East Midlands England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningJun 2014 (completed)
  2. ConsentedOct 2014 (completed)
  3. ConstructionDec 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
18.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LE14 3PR
Coordinates
52.7849, -1.0626

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Six Hills compares

62nd of 662largest solar farms in the UK register
12th of 95in East Midlands
0.33%of listed UK solar farms capacity
β‰ˆ 16 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 18.7 MW station would generate roughly 16 GWh of electricity in a year, similar to the annual use of about 6,080 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Six Hills Solar Farm
Developer / operator
Lightsource Renewable Energy
Planning authority
Melton
Planning reference
14/00529/FUL
Application submitted
27 June 2014
Permission granted
16 October 2014
Construction started
16 December 2014
Began operating
24 March 2015
Capacity in planning record
18.7 MW
Address
Field OS 00077 And 6867 Six Hills Road Ragdale, Leicestershire
REPD reference
2057

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.