Asfordby A
Asfordby A is a 4.91 MW solar farm in East Midlands England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 4.91 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- WPO UK Services
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 52.7732, -0.8970
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Asfordby A compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.91 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,590 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by WPO UK ServicesNearby generating sites
- Asfordby B Β· 4.98 MW solar farm2.0 km
- Dalby Β· 7.29 MW onshore wind farm9.3 km
- Dalby Solar Β· 6.88 MW solar farm10.1 km
- Six Hills Β· 18.7 MW solar farm11.2 km
- Wymeswold - Wide Lane Β· 4.28 MW solar farm11.5 km
- Wymeswold Β· 2.13 MW solar farm14.8 km
- Cotgrave Β· 4.98 MW solar farm19.1 km
- Stragglethorpe Β· 5 MW solar farm19.6 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.