Grange Farm
Grange Farm is a 21.1 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 21.1 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BS36 1RR
- Coordinates
- 51.5390, -2.5209
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Grange Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 21.1 MW station would generate roughly 18 GWh of electricity in a year, similar to the annual use of about 6,850 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Greencoat CapitalNearby generating sites
- Rolls Royce Β· 3.2 MW solar farm3.8 km
- Alveston Β· 6.9 MW onshore wind farm4.0 km
- Oakham Β· 4.64 MW solar farm4.4 km
- Says Court Β· 19.8 MW solar farm5.0 km
- Severn Beach Β· 3.96 MW solar farm9.7 km
- Seabank Power Station Β· 1,234 MW power station10.1 km
- Oldbury Nuclear Power Station Β· 434 MW nuclear power station12.7 km
- Bristol Port Β· 6 MW onshore wind farm13.3 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Grange Farm (Avon)
- Developer / operator
- Solar Power South
- Planning authority
- South Gloucestershire
- Planning reference
- PT13/3662/F
- Application submitted
- 17 October 2013
- Permission granted
- 6 January 2014
- Construction started
- 1 September 2014
- Began operating
- 11 December 2014
- Capacity in planning record
- 21 MW
- Address
- Grange Farm, Old Gloucester Road, Winterbourne, Bristol, South Gloucestershire, Avon, BS36 1RR
- REPD reference
- 1914
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.