SOLAR Β· OPERATIONAL

Grange Farm

Grange Farm is a 21.1 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningOct 2013 (completed)
  2. ConsentedJan 2014 (completed)
  3. ConstructionSep 2014 (completed)
  4. OperatingDec 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
21.1 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BS36 1RR
Coordinates
51.5390, -2.5209

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Grange Farm compares

45th of 662largest solar farms in the UK register
7th of 192in South West
0.37%of listed UK solar farms capacity
β‰ˆ 18 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 21.1 MW station would generate roughly 18 GWh of electricity in a year, similar to the annual use of about 6,850 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Grange Farm (Avon)
Developer / operator
Solar Power South
Planning authority
South Gloucestershire
Planning reference
PT13/3662/F
Application submitted
17 October 2013
Permission granted
6 January 2014
Construction started
1 September 2014
Began operating
11 December 2014
Capacity in planning record
21 MW
Address
Grange Farm, Old Gloucester Road, Winterbourne, Bristol, South Gloucestershire, Avon, BS36 1RR
REPD reference
1914

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026