WIND Β· OPERATIONAL

Bishopthorpe

Bishopthorpe is a 16.4 MW onshore wind farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England
Project stageOperating
  1. PlanningOct 2012 (completed)
  2. ConsentedMar 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingJan 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
16.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
53.5099, -0.0007

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bishopthorpe compares

251st of 488largest wind farms in the UK register
8th of 34in East Midlands
0.06%of listed UK wind farms capacity
β‰ˆ 37 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 16.4 MW station would generate roughly 37 GWh of electricity in a year, similar to the annual use of about 13,830 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Greencoat UK (formerly BayWa r.e.)
Planning authority
East Lindsey
Planning reference
N/178/01969/12
Application submitted
2 October 2012
Permission granted
20 March 2015
Construction started
25 January 2016
Began operating
30 January 2017
Capacity in planning record
16.4 MW
Address
Bishopthorpe Farm, Bishopthorpe, Tetney, Grimsby, Humberside, Lincolnshire
REPD reference
4256

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.