Red Gap
Red Gap is a 12.5 MW onshore wind farm in North East England, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North East
- England
Key facts
- Installed capacity
- 12.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Capital Dynamics UK
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TS27 3HH
- Coordinates
- 54.6468, -1.3206
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Red Gap compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 12.5 MW station would generate roughly 28 GWh of electricity in a year, similar to the annual use of about 10,540 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North East All run by Capital Dynamics UKNearby generating sites
- Low Burntoft Β· 5 MW solar farm1.8 km
- Blue House Β· 4.98 MW solar farm3.3 km
- Butterwick Moor Circuit 1 Β· 9.4 MW onshore wind farm5.3 km
- Walkway Β· 14 MW onshore wind farm5.3 km
- Butterwick Moor Circuit 2 Β· 9.4 MW onshore wind farm5.3 km
- High Volts RO Β· 5.5 MW onshore wind farm5.4 km
- High Volts Β· 2.3 MW onshore wind farm5.6 km
- High Meadow Β· 3.89 MW solar farm7.8 km
Also operated by Capital Dynamics UK
Capital Dynamics UK operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Red Gap Moor Wind Farm
- Developer / operator
- Capital Dynamics
- Planning authority
- Hartlepool
- Planning reference
- H/2009/0231
- Application submitted
- 20 May 2009
- Permission granted
- 31 March 2011
- Construction started
- 26 May 2016
- Began operating
- 15 February 2017
- Capacity in planning record
- 12.5 MW
- Address
- Sunderland Road,Wolviston, Billingham, Cleveland, Cleveland, TS22 5PA
- REPD reference
- 4415
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.