πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Barrow

Barrow is a 90 MW offshore wind farm in North West England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • North West
  • England
Project stageOperating
  1. PlanningMay 2002 (completed)
  2. ConsentedMar 2003 (completed)
  3. ConstructionMay 2005 (completed)
  4. OperatingApr 2006 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
90 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Orsted
Region
North West
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
53.9915, -3.2983

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Barrow compares

61st of 488largest wind farms in the UK register
8th of 32in North West
0.31%of listed UK wind farms capacity
β‰ˆ 300 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 90 MW station would generate roughly 300 GWh of electricity in a year, similar to the annual use of about 110,960 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by Orsted

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
BarrowΒ 
Developer / operator
Orsted (formerly Dong Energy)
Planning authority
DECC (S36)
Application submitted
10 May 2002
Permission granted
12 March 2003
Construction started
1 May 2005
Began operating
1 April 2006
Capacity in planning record
90 MW
Address
7km Walney Island, near Barrow-in-Furness, Offshore
REPD reference
2546

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026