Wix Lodge (Stour Fields)

Wix Lodge (Stour Fields) is a 18.7 MW solar farm in East of England, England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningAug 2013 (completed)
  2. ConsentedNov 2013 (completed)
  3. Construction (completed)
  4. OperatingMar 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
18.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
RES Group
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CO11 2RP
Coordinates
51.9128, 1.1241

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wix Lodge (Stour Fields) compares

63rd of 662largest solar farms in the UK register
20th of 76in East of England
0.33%of listed UK solar farms capacity
β‰ˆ 16 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 18.7 MW station would generate roughly 16 GWh of electricity in a year, similar to the annual use of about 6,070 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wix Lodge
Developer / operator
Sunsave 25 (Wix Lodge Farm) Limited/ Vogt Solar
Planning authority
Tendring
Planning reference
13/00896/FUL
Application submitted
19 August 2013
Permission granted
15 November 2013
Began operating
31 March 2014
Capacity in planning record
18.7 MW
Address
Wix Lodge Colchester Road Wix Manningtree Essex CO11 2RP, Essex
REPD reference
1332

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.