Barn Farm

Barn Farm is a 4.69 MW solar farm in East of England, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningJul 2014 (completed)
  2. ConsentedOct 2014 (completed)
  3. ConstructionMay 2015 (completed)
  4. OperatingAug 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.69 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CO11 2UX
Coordinates
51.9392, 1.1364

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Barn Farm compares

473rd of 662largest solar farms in the UK register
70th of 76in East of England
0.08%of listed UK solar farms capacity
β‰ˆ 4.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.69 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,520 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Lightsource Renewable Energy
Planning authority
Tendring
Planning reference
14/00918/FUL
Application submitted
10 July 2014
Permission granted
20 October 2014
Construction started
8 May 2015
Began operating
14 August 2015
Capacity in planning record
4.2 MW
Address
Land at Barn Farm Wix Road Bradfield Manningtree, Essex
REPD reference
1959

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026