SOLAR Β· OPERATIONAL

Chisbon

Chisbon is a 12.3 MW solar farm in East of England, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningMay 2013 (completed)
  2. ConsentedJul 2013 (completed)
  3. ConstructionNov 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12.3 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CO16 8HJ
Coordinates
51.8219, 1.0873

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Chisbon compares

101st of 662largest solar farms in the UK register
23rd of 76in East of England
0.22%of listed UK solar farms capacity
β‰ˆ 11 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12.3 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 4,000 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Chisbon Solar Farm (Frowick Lane)
Developer / operator
ESCO NRG
Planning authority
Tendring
Planning reference
13/00360/FUL
Application submitted
8 May 2013
Permission granted
26 July 2013
Construction started
15 November 2014
Began operating
5 March 2015
Capacity in planning record
13 MW
Address
Land North of Frowick Lane St Osyth Essex CO16 8HJ, Essex, CO16 8HJ
REPD reference
1950

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.