SOLAR Β· OPERATIONAL

Bluegates

Bluegates is a 10.7 MW solar farm in East of England, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningApr 2014 (completed)
  2. ConsentedJul 2014 (completed)
  3. ConstructionOct 2014 (completed)
  4. OperatingJan 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CO7 8DE
Coordinates
51.8607, 1.0050

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bluegates compares

132nd of 662largest solar farms in the UK register
29th of 76in East of England
0.19%of listed UK solar farms capacity
β‰ˆ 9.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 10.7 MW station would generate roughly 9.4 GWh of electricity in a year, similar to the annual use of about 3,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bluegates Solar Park
Developer / operator
Edgar Middleton
Planning authority
Colchester
Planning reference
14/00352/FUL
Application submitted
4 April 2014
Permission granted
4 July 2014
Construction started
1 October 2014
Began operating
30 January 2015
Capacity in planning record
10.5 MW
Address
Blue Gates Farm Colchester Main Road Alresford, Essex, CO7 8DE
REPD reference
5125

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.