Gunfleet Sands Demo

Gunfleet Sands Demo is a 12 MW offshore wind farm in East of England, England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • East of England
  • England
Project stageOperating
  1. Planning (completed)
  2. ConsentedApr 2012 (completed)
  3. ConstructionMay 2012 (completed)
  4. OperatingApr 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Orsted
Region
East of England
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
51.7030, 1.1919

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Gunfleet Sands Demo compares

305th of 488largest wind farms in the UK register
27th of 48in East of England
0.04%of listed UK wind farms capacity
β‰ˆ 40 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 12 MW station would generate roughly 40 GWh of electricity in a year, similar to the annual use of about 14,790 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Orsted

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Gunfleet Sands - (Demo) Extension
Developer / operator
Orsted (formerly Dong Energy)
Planning authority
DECC (S36)
Permission granted
17 April 2012
Construction started
15 May 2012
Began operating
19 April 2013
Capacity in planning record
12 MW
Address
off the Essex coast, Offshore
REPD reference
2488

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.