πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Gunfleet Sands 02

Gunfleet Sands 02 is a 173 MW offshore wind farm in East of England, England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • East of England
  • England

Key facts

Installed capacity
173 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Orsted
Region
East of England
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
51.7272, 1.2459

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Gunfleet Sands 02 compares

38th of 488largest wind farms in the UK register
5th of 48in East of England
0.59%of listed UK wind farms capacity
β‰ˆ 575 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 173 MW station would generate roughly 575 GWh of electricity in a year, similar to the annual use of about 213,040 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Orsted

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Gunfleet Sands IIΒ 
Developer / operator
Orsted (formerly Dong Energy)
Planning authority
DECC (S36)
Application submitted
18 June 2007
Permission granted
28 February 2008
Construction started
1 April 2009
Began operating
24 July 2009
Capacity in planning record
64.8 MW
Address
5 Miles from the Essex coast at Frinton-on-Sea, Offshore
REPD reference
2489

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.