Bhlaraidh Wind Farm
Bhlaraidh Wind Farm is a 110 MW onshore wind farm in Scotland, operated by SSE Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 110 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- SSE Group
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 57.2105, -4.6793
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bhlaraidh Wind Farm compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 110 MW station would generate roughly 251 GWh of electricity in a year, similar to the annual use of about 93,130 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by SSE GroupNearby generating sites
- Livishie Power Station - A Β· 15 MW hydroelectric station2.2 km
- Invergarry Dam - A, E Β· 0.24 MW small hydro scheme7.2 km
- Dundreggan Dam A Β· 0.16 MW small hydro scheme7.4 km
- Glendoe Hydro Power Station Β· 100 MW hydroelectric station7.7 km
- Glenmoriston Β· 37 MW hydroelectric station8.2 km
- Loyne Power Station - A,C Β· 0.55 MW small hydro scheme10.2 km
- Foyers Falls Power Station Β· 5.2 MW hydroelectric station12.1 km
- Garrogie Β· 2.4 MW small hydro scheme12.2 km
Also operated by SSE Group
SSE Group operates 127 sites in the register. Largest first:
- Peterhead Β· gas-fired power station1,180 MW
- Seagreen Β· offshore wind farm1,075 MW
- Keadby 2 Β· gas-fired power station840 MW
- Medway Β· gas-fired power station755 MW
- Keadby Β· CCGT gas power station735 MW
- Beatrice Offshore windfarm Β· offshore wind farm588 MW
- Greater Gabbard Β· offshore wind farm504 MW
- Viking Wind Farm Β· onshore wind farm443 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Planning Permission Granted
- Site name in planning record
- Bhlaraidh Wind Farm Extension
- Developer / operator
- SSE Renewables
- Planning authority
- Scottish Government (S36)
- Planning reference
- ECU00001900
- Application submitted
- 16 August 2021
- Permission granted
- 30 August 2022
- Capacity in planning record
- 84 MW
- Address
- Land adjacent to operational Blaraidh Wind Farm, near Invermoriston, Highland, IV3
- REPD reference
- 7473
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.