Morton Solar

Morton Solar is a 28.1 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England

Key facts

Installed capacity
28.1 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DN22 8HD
Coordinates
53.3079, -0.9942

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Morton Solar compares

32nd of 662largest solar farms in the UK register
6th of 95in East Midlands
0.50%of listed UK solar farms capacity
β‰ˆ 25 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 28.1 MW station would generate roughly 25 GWh of electricity in a year, similar to the annual use of about 9,120 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Walkers Wood Solar Park
Developer / operator
Solar century / Magnetar Solar
Planning authority
Bassetlaw
Planning reference
14/00681/FUL
Application submitted
27 May 2014
Permission granted
18 September 2014
Construction started
1 October 2014
Began operating
10 March 2015
Capacity in planning record
27 MW
Address
Land West Of Green Lane Off Straight Mile Ranby Nottinghamshire, Nottinghamshire, DN22 8
REPD reference
2151

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.