Westwood Farm

Westwood Farm is a 5.15 MW solar farm in East Midlands England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningOct 2013 (completed)
  2. ConsentedDec 2013 (completed)
  3. ConstructionSep 2014 (completed)
  4. OperatingJan 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.15 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NG22 0PF
Coordinates
53.2228, -0.9266

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Westwood Farm compares

249th of 662largest solar farms in the UK register
36th of 95in East Midlands
0.09%of listed UK solar farms capacity
β‰ˆ 4.5 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.15 MW station would generate roughly 4.5 GWh of electricity in a year, similar to the annual use of about 1,670 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Westwood Farm Solar Park
Developer / operator
Lightsource Renewable Energy
Planning authority
Bassetlaw
Planning reference
13/01182/FUL
Application submitted
18 October 2013
Permission granted
24 December 2013
Construction started
27 September 2014
Began operating
12 January 2015
Capacity in planning record
5.1 MW
Address
Ollerton Road, Tuxford, Newark, Nottinghamshire, Nottinghamshire, NG22 0PF
REPD reference
1818

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026