WIND Β· OPERATIONAL

Worksop

Worksop is a 2 MW onshore wind farm in East Midlands England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England

Key facts

Installed capacity
2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Ecotricity
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
S80 2PU
Coordinates
53.2998, -1.0757

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Worksop compares

468th of 488largest wind farms in the UK register
32nd of 34in East Midlands
0.01%of listed UK wind farms capacity
β‰ˆ 4.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 2 MW station would generate roughly 4.6 GWh of electricity in a year, similar to the annual use of about 1,690 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by Ecotricity

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Worksop - B&Q
Developer / operator
Ecotricity
Planning authority
Bassetlaw
Planning reference
1/2/07/528
Application submitted
7 September 2007
Permission granted
1 November 2007
Construction started
1 December 2008
Began operating
21 January 2009
Capacity in planning record
2 MW
Address
Manton Wood, Worksop, Nottinghamshire, Nottinghamshire
REPD reference
3510

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.