Tullo
Tullo is a 17.5 MW onshore wind farm in Scotland, operated by Eneco Wind UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 17.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Eneco Wind UK
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 56.9639, -2.2108
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Tullo compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 17.5 MW station would generate roughly 40 GWh of electricity in a year, similar to the annual use of about 14,760 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Eneco Wind UKNearby generating sites
- Meikle Carewe Wind Farm (GB) Β· 10.2 MW onshore wind farm7.4 km
- Mid Hill Β· 75.9 MW onshore wind farm16.7 km
- Twinshiels Β· 25 MW onshore wind farm18.1 km
- Aberdeen Β· 96.8 MW offshore wind farm29.6 km
- Hill of Fiddes Β· 6.9 MW onshore wind farm39.1 km
- Kildrummy Β· 18.4 MW onshore wind farm41.6 km
- Kinblethmont Β· 5 MW solar farm45.8 km
- Park Hill Β· 5 MW solar farm46.1 km
Also operated by Eneco Wind UK
Eneco Wind UK operates 6 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Tullo Farm
- Developer / operator
- West Coast Energy (agents for Tullo Wind Ltd and GE Wind)
- Planning authority
- Aberdeenshire
- Planning reference
- APP/2003/0756
- Application submitted
- 13 October 2003
- Permission granted
- 30 June 2004
- Construction started
- 1 April 2010
- Began operating
- 7 September 2010
- Capacity in planning record
- 17.5 MW
- Address
- Tullo Farm, Laurencekirk, Aberdeenshire Garvock Laurencekirk, Grampian
- REPD reference
- 3190
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.