Hill of Fiddes
Hill of Fiddes is a 6.9 MW onshore wind farm in Scotland, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 6.9 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- AB41 6QR
- Coordinates
- 57.3109, -2.1096
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Hill of Fiddes compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6.9 MW station would generate roughly 16 GWh of electricity in a year, similar to the annual use of about 5,820 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Venitent Energy ServicesNearby generating sites
- Aberdeen Β· 96.8 MW offshore wind farm10.4 km
- Peterhead Β· 1,180 MW gas-fired power station26.7 km
- Gordonstown Hill Β· 12.5 MW onshore wind farm28.0 km
- Boganlea Β· 2.31 MW onshore wind farm30.6 km
- Meikle Carewe Wind Farm (GB) Β· 10.2 MW onshore wind farm34.0 km
- Glens of Foudland Β· 26 MW onshore wind farm34.4 km
- Kildrummy Β· 18.4 MW onshore wind farm36.9 km
- Dummuies Β· 12.3 MW onshore wind farm38.2 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Infinis, previously Broadview Energy
- Planning authority
- Aberdeenshire
- Planning reference
- APP/2007/3578
- Application submitted
- 3 September 2007
- Permission granted
- 1 April 2008
- Construction started
- 1 July 2009
- Began operating
- 20 February 2010
- Capacity in planning record
- 6.9 MW
- Address
- Hill of Fiddes Udny Station Cultercullen, Grampian
- REPD reference
- 3968
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.