Park Hill

Park Hill is a 5 MW solar farm in Scotland, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Scotland
Project stageOperating
  1. PlanningNov 2015 (completed)
  2. ConsentedFeb 2016 (completed)
  3. ConstructionJan 2017 (completed)
  4. OperatingNov 2018 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
DD11 4QU
Coordinates
56.6038, -2.5860

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Park Hill compares

252nd of 662largest solar farms in the UK register
3rd of 9in Scotland
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Scotland All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Parkhill Solar Farm
Developer / operator
Innova / Lark Energy
Planning authority
Angus
Planning reference
15/00973/FULL
Application submitted
2 November 2015
Permission granted
3 February 2016
Construction started
1 January 2017
Began operating
1 November 2018
Capacity in planning record
5 MW
Address
Field 540M W Of Parkhill Farm, Letham Grange, Arbroath, Tayside, Scotland, Angus, DD11 5RG
REPD reference
5914

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.