Twinshiels
Twinshiels is a 25 MW onshore wind farm in Scotland, operated by Eneco Wind UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 25 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Eneco Wind UK
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 56.8364, -2.3957
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Twinshiels compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 25 MW station would generate roughly 57 GWh of electricity in a year, similar to the annual use of about 21,090 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Eneco Wind UKNearby generating sites
- Mid Hill Β· 75.9 MW onshore wind farm15.7 km
- Tullo Β· 17.5 MW onshore wind farm18.1 km
- Meikle Carewe Wind Farm (GB) Β· 10.2 MW onshore wind farm21.5 km
- Kinblethmont Β· 5 MW solar farm27.9 km
- Park Hill Β· 5 MW solar farm28.4 km
- Pressock Β· 4.25 MW solar farm29.1 km
- Guynd Β· 9.5 MW solar farm35.0 km
- Aberdeen Β· 96.8 MW offshore wind farm46.9 km
Also operated by Eneco Wind UK
Eneco Wind UK operates 6 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Easter Tulloch Wind Farm (Tullo Extension)
- Developer / operator
- N R Gammie Partnership
- Planning authority
- Aberdeenshire
- Planning reference
- APP/2011/2603
- Application submitted
- 9 August 2011
- Permission granted
- 21 September 2012
- Construction started
- 1 May 2013
- Began operating
- 30 June 2014
- Capacity in planning record
- 25 MW
- Address
- Land to North of Tullo Farm Laurencekirk, Grampian
- REPD reference
- 4365
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.