Guynd is a 9.5 MW solar farm in Scotland, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Scotland
Project stageOperating
  1. PlanningJun 2014 (completed)
  2. ConsentedOct 2014 (completed)
  3. ConstructionDec 2015 (completed)
  4. OperatingJun 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
9.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Cubico Sustainable Investments
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DD11 2QR
Coordinates
56.5748, -2.7140

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Guynd compares

156th of 662largest solar farms in the UK register
2nd of 9in Scotland
0.17%of listed UK solar farms capacity
β‰ˆ 8.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 9.5 MW station would generate roughly 8.3 GWh of electricity in a year, similar to the annual use of about 3,080 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Scotland All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
New Mains Of Guynd Farm
Developer / operator
BWE Partnership
Planning authority
Angus
Planning reference
14/00526/FULL
Application submitted
23 June 2014
Permission granted
6 October 2014
Construction started
17 December 2015
Began operating
15 June 2016
Capacity in planning record
10 MW
Address
Field 325M North Of New Mains Of Guynd Farm Guynd Arbroath, Tayside
REPD reference
4844

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.