Wether Hill is a 18.2 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland

Key facts

Installed capacity
18.2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DG7 3UG
Coordinates
55.2231, -4.0452

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wether Hill compares

239th of 488largest wind farms in the UK register
139th of 199in Scotland
0.06%of listed UK wind farms capacity
β‰ˆ 41 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 18.2 MW station would generate roughly 41 GWh of electricity in a year, similar to the annual use of about 15,350 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Scottish Power/CRE Energy
Planning authority
Dumfries and Galloway
Planning reference
03P30746
Application submitted
8 January 2004
Permission granted
1 March 2005
Construction started
1 August 2006
Began operating
1 May 2007
Capacity in planning record
18.2 MW
Address
Moniaive Dumfries, Dumfries and Galloway
REPD reference
4519

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.