WIND Β· OPERATIONAL

Hare Hill I

Hare Hill I is a 13.2 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningFeb 1996 (completed)
  2. ConsentedOct 1998 (completed)
  3. Construction (completed)
  4. OperatingNov 2000 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
13.2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
KA18 4NW
Coordinates
55.3628, -4.1263

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Hare Hill I compares

290th of 488largest wind farms in the UK register
158th of 199in Scotland
0.04%of listed UK wind farms capacity
β‰ˆ 30 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 13.2 MW station would generate roughly 30 GWh of electricity in a year, similar to the annual use of about 11,130 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hare Hill (East Ayrshire)
Developer / operator
Scottish Power Renewables
Planning authority
East Ayrshire
Application submitted
10 February 1996
Permission granted
12 October 1998
Began operating
1 November 2000
Capacity in planning record
13.2 MW
Address
New Cumnock, East Ayreshire, Strathclyde
REPD reference
2711

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.