WIND Β· OPERATIONAL

TwentyShilling Hill

TwentyShilling Hill is a 37.8 MW onshore wind farm in Scotland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningFeb 2018 (completed)
  2. ConsentedDec 2019 (completed)
  3. ConstructionJul 2020 (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
37.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
55.3197, -3.9003

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How TwentyShilling Hill compares

135th of 488largest wind farms in the UK register
79th of 199in Scotland
0.13%of listed UK wind farms capacity
β‰ˆ 86 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 37.8 MW station would generate roughly 86 GWh of electricity in a year, similar to the annual use of about 31,890 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Under Construction
Site name in planning record
Twentyshilling Hill Wind Farm
Developer / operator
Element Power
Planning authority
Dumfries and Galloway
Planning reference
18/0206/FUL
Application submitted
22 February 2018
Permission granted
23 December 2019
Construction started
1 July 2020
Capacity in planning record
37.8 MW
Address
Twentyshilling Hill Wind Farm, Greystone Avenue, Kelloholm, Sanquhar, Dumfries and Galloway, DG4 6RY
REPD reference
6590

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.