TwentyShilling Hill
TwentyShilling Hill is a 37.8 MW onshore wind farm in Scotland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 37.8 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Greencoat Capital
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 55.3197, -3.9003
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How TwentyShilling Hill compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 37.8 MW station would generate roughly 86 GWh of electricity in a year, similar to the annual use of about 31,890 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Greencoat CapitalNearby generating sites
- Whiteside Hill Β· 28.5 MW onshore wind farm9.2 km
- Sanquhar Β· 31.1 MW onshore wind farm9.6 km
- Wether Hill Β· 18.2 MW onshore wind farm14.1 km
- Hare Hill I Β· 13.2 MW onshore wind farm15.1 km
- Brockloch Rig Β· 61.5 MW onshore wind farm16.4 km
- Hare Hill II Β· 29.8 MW onshore wind farm16.5 km
- Brockloch Rig 1 Β· 21.6 MW onshore wind farm18.1 km
- Windy Rig Β· 43.2 MW onshore wind farm18.3 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Under Construction
- Site name in planning record
- Twentyshilling Hill Wind Farm
- Developer / operator
- Element Power
- Planning authority
- Dumfries and Galloway
- Planning reference
- 18/0206/FUL
- Application submitted
- 22 February 2018
- Permission granted
- 23 December 2019
- Construction started
- 1 July 2020
- Capacity in planning record
- 37.8 MW
- Address
- Twentyshilling Hill Wind Farm, Greystone Avenue, Kelloholm, Sanquhar, Dumfries and Galloway, DG4 6RY
- REPD reference
- 6590
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026