Lains Farm
Lains Farm is a 4.54 MW solar farm in South East England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 4.54 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- WPO UK Services
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 51.1988, -1.6116
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Lains Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.54 MW station would generate roughly 4.0 GWh of electricity in a year, similar to the annual use of about 1,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by WPO UK ServicesNearby generating sites
- Shipton Bellinger Β· 5.43 MW solar farm3.8 km
- Parkhouse Β· 6.64 MW solar farm4.4 km
- Westover Β· 7.04 MW solar farm8.4 km
- Hale Farm Solar Ltd Β· 12.2 MW solar farm10.1 km
- Fullerton Β· 4.36 MW solar farm10.2 km
- Eveley Β· 49.3 MW solar farm12.5 km
- Owls Lodge Β· 10 MW solar farm16.7 km
- Overton Β· 3.75 MW solar farm24.0 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- INRG
- Planning authority
- Test Valley
- Planning reference
- 14/03017/FULLN
- Application submitted
- 5 December 2014
- Permission granted
- 17 July 2015
- Construction started
- 1 May 2016
- Began operating
- 24 March 2016
- Capacity in planning record
- 5 MW
- Address
- Land at Lains Farm, Lains Paddock, Quarley, Andover, Hampshire, Hampshire, SP11 8PU
- REPD reference
- 1840
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.