πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Wyld Meadow Farm Solar Park

Wyld Meadow Farm Solar Park is a 4.84 MW solar farm in South West England, operated by Wise Energy Limited. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningApr 2011 (completed)
  2. ConsentedJul 2011 (completed)
  3. Construction (completed)
  4. OperatingApr 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.84 MW
Status
Operational
Technology
Solar Β· PV
Operator
Wise Energy Limited
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EX13 5UL
Coordinates
50.7792, -2.9354

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wyld Meadow Farm Solar Park compares

457th of 662largest solar farms in the UK register
109th of 192in South West
0.09%of listed UK solar farms capacity
β‰ˆ 4.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.84 MW station would generate roughly 4.2 GWh of electricity in a year, similar to the annual use of about 1,570 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Wise Energy Limited

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wyld Meadow Solar Farm
Developer / operator
NextEnery Solar Fund (NESF)
Planning authority
Dorset
Planning reference
1/D/11/000453
Application submitted
13 April 2011
Permission granted
13 July 2011
Began operating
1 April 2012
Capacity in planning record
4.8 MW
Address
Wyld Meadow Farm, Pound Lane, Monkton Wyld, Bridport, Dorset, DT6 6DD
REPD reference
1574

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.