Blenches Mill Solar Park
Blenches Mill Solar Park is a 6.08 MW solar farm in South West England, operated by Wise Energy Limited. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 6.08 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Wise Energy Limited
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BA13 4LR
- Coordinates
- 51.2746, -2.1899
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Blenches Mill Solar Park compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 6.08 MW station would generate roughly 5.3 GWh of electricity in a year, similar to the annual use of about 1,970 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Wise Energy LimitedNearby generating sites
- Brook Hall Β· 4.67 MW solar farm1.8 km
- Ashton Β· 4.81 MW solar farm5.7 km
- Trowle Β· 5 MW solar farm6.5 km
- Craymarsh Β· 1.82 MW solar farm11.8 km
- Norrington Β· 11.2 MW solar farm12.2 km
- Sandridge Β· 49.6 MW solar farm13.0 km
- East Farm Β· 6.84 MW solar farm16.0 km
- Cloford Common Farm Β· 5 MW solar farm16.6 km
Also operated by Wise Energy Limited
Wise Energy Limited operates 9 sites in the register. Largest first:
- Hook Valley Solar Park Β· solar farm15.3 MW
- Burcroft Solar Parks Β· solar farm12.7 MW
- Whitley (Ashcott Farm) Solar Park Β· solar farm7.57 MW
- Raglington Farm Solar Park Β· solar farm5.73 MW
- Chilton Cantelo Solar park Β· solar farm5 MW
- Crossways Solar Park Β· solar farm5 MW
- Wyld Meadow Farm Solar Park Β· solar farm4.84 MW
- Knockworthy Farm Solar Park Β· solar farm4.65 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Blenches Mill
- Developer / operator
- NextEnery Solar Fund (NESF)
- Planning authority
- Wiltshire
- Planning reference
- W/12/02081/FUL
- Application submitted
- 22 November 2012
- Permission granted
- 28 November 2013
- Began operating
- 31 March 2014
- Capacity in planning record
- 6.1 MW
- Address
- Adj Sewage Treatment Works, Slag Lane, Westbury, Wiltshire, Wiltshire, BA13 4HZ
- REPD reference
- 1969
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.