East Farm
East Farm is a 6.84 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 6.84 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BA12 0PG
- Coordinates
- 51.1783, -2.0196
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How East Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 6.84 MW station would generate roughly 6.0 GWh of electricity in a year, similar to the annual use of about 2,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AnescoNearby generating sites
- Malmpit Β· 5 MW solar farm2.7 km
- Blenches Mill Solar Park Β· 6.08 MW solar farm16.0 km
- Brook Hall Β· 4.67 MW solar farm17.7 km
- Ashton Β· 4.81 MW solar farm18.7 km
- Hale Farm Solar Ltd Β· 12.2 MW solar farm21.1 km
- Craymarsh Β· 1.82 MW solar farm21.2 km
- Shaftesbury Β· 5 MW solar farm21.5 km
- Trowle Β· 5 MW solar farm22.2 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land at East Farm
- Developer / operator
- Anesco
- Planning authority
- Wiltshire
- Planning reference
- W/12/02216/FUL
- Application submitted
- 3 January 2013
- Permission granted
- 19 March 2013
- Construction started
- 9 October 2013
- Began operating
- 9 November 2013
- Capacity in planning record
- 6.8 MW
- Address
- Codford Dairy, East Farm, Church Lane, Codford, Wiltshire
- REPD reference
- 1748
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.