πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Norrington

Norrington is a 11.2 MW solar farm in South West England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningNov 2012 (completed)
  2. ConsentedApr 2013 (completed)
  3. ConstructionMar 2014 (completed)
  4. OperatingJul 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
11.2 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SN12 8LT
Coordinates
51.3833, -2.1701

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Norrington compares

125th of 662largest solar farms in the UK register
23rd of 192in South West
0.20%of listed UK solar farms capacity
β‰ˆ 9.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.2 MW station would generate roughly 9.8 GWh of electricity in a year, similar to the annual use of about 3,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Norrington Common Solar Farm
Developer / operator
Terraform Power (SunEdison)
Planning authority
Wiltshire
Planning reference
W/12/02072/FUL
Application submitted
22 November 2012
Permission granted
25 April 2013
Construction started
1 March 2014
Began operating
4 July 2014
Capacity in planning record
10 MW
Address
Broughton Gifford, Wiltshire, Wiltshire
REPD reference
2285

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.