SOLAR Β· OPERATIONAL

Hullavington

Hullavington is a 8.32 MW solar farm in South West England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningMay 2013 (completed)
  2. ConsentedNov 2013 (completed)
  3. ConstructionOct 2014 (completed)
  4. OperatingFeb 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8.32 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SN14 6QP
Coordinates
51.5395, -2.1578

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Hullavington compares

171st of 662largest solar farms in the UK register
41st of 192in South West
0.15%of listed UK solar farms capacity
β‰ˆ 7.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 8.32 MW station would generate roughly 7.3 GWh of electricity in a year, similar to the annual use of about 2,700 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hullavington Solar Park
Developer / operator
Wessex Solar Energy
Planning authority
Wiltshire
Planning reference
13/01495/FUL
Application submitted
22 May 2013
Permission granted
13 November 2013
Construction started
20 October 2014
Began operating
3 February 2015
Capacity in planning record
7 MW
Address
Land at Hullavington, Wiltshire, Wiltshire
REPD reference
2384

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.