Hullavington
Hullavington is a 8.32 MW solar farm in South West England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 8.32 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SN14 6QP
- Coordinates
- 51.5395, -2.1578
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Hullavington compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 8.32 MW station would generate roughly 7.3 GWh of electricity in a year, similar to the annual use of about 2,700 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Octopus InvestmentsNearby generating sites
- Castle Combe Β· 15.3 MW solar farm6.6 km
- Newnton Dairy Β· 7.18 MW solar farm10.2 km
- Bradenstoke Solar Park Ltd Β· 69.8 MW solar farm13.6 km
- Norrington Β· 11.2 MW solar farm17.4 km
- Sandridge Β· 49.6 MW solar farm19.1 km
- Spittleborough Β· 9.14 MW solar farm19.1 km
- Bentham Β· 11.1 MW solar farm19.4 km
- Lynch Knoll Β· 0.5 MW onshore wind farm19.6 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Hullavington Solar Park
- Developer / operator
- Wessex Solar Energy
- Planning authority
- Wiltshire
- Planning reference
- 13/01495/FUL
- Application submitted
- 22 May 2013
- Permission granted
- 13 November 2013
- Construction started
- 20 October 2014
- Began operating
- 3 February 2015
- Capacity in planning record
- 7 MW
- Address
- Land at Hullavington, Wiltshire, Wiltshire
- REPD reference
- 2384
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source