SOLAR Β· OPERATIONAL

Bradenstoke Solar Park Ltd

Bradenstoke Solar Park Ltd is a 69.8 MW solar farm in South West England, operated by Bluefield Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningJul 2014 (completed)
  2. ConsentedNov 2014 (completed)
  3. ConstructionJan 2015 (completed)
  4. OperatingSep 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
69.8 MW
Status
Operational
Technology
Solar Β· PV
Operator
Bluefield Services
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SN15 4PZ
Coordinates
51.5066, -1.9680

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bradenstoke Solar Park Ltd compares

4th of 662largest solar farms in the UK register
1st of 192in South West
1.2%of listed UK solar farms capacity
β‰ˆ 61 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 69.8 MW station would generate roughly 61 GWh of electricity in a year, similar to the annual use of about 22,640 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Bluefield Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bradenstoke solar park
Developer / operator
Defence Infrastructure Organisation / BSR
Planning authority
Wiltshire
Planning reference
14/06989/FUL
Application submitted
23 July 2014
Permission granted
13 November 2014
Construction started
1 January 2015
Began operating
21 September 2016
Capacity in planning record
69.8 MW
Address
Mod Lyneham, Lyneham, Chippenham, Wiltshire, Wiltshire, SN15 4XX
REPD reference
2203

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.