Pingewood is a 15.4 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England

Key facts

Installed capacity
15.4 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
RG30 3UG
Coordinates
51.4179, -0.9969

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Pingewood compares

75th of 662largest solar farms in the UK register
12th of 105in South East
0.27%of listed UK solar farms capacity
β‰ˆ 13 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 15.4 MW station would generate roughly 13 GWh of electricity in a year, similar to the annual use of about 4,990 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Pingewood Road South
Developer / operator
BayWa/ SunGift
Planning authority
West Berkshire
Planning reference
14/01800/COMIND
Application submitted
24 July 2014
Permission granted
9 October 2014
Construction started
1 December 2014
Began operating
30 March 2015
Capacity in planning record
15.8 MW
Address
Land North Of Pingewood Road, South Burghfield, Reading, Berkshire, Berkshire
REPD reference
2011

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.