Green Park
Green Park is a 2 MW onshore wind farm in South East England, operated by Ecotricity. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- South East
- England
Key facts
- Installed capacity
- 2 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Ecotricity
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- RG2 6UE
- Coordinates
- 51.4180, -0.9839
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Green Park compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 2 MW station would generate roughly 4.6 GWh of electricity in a year, similar to the annual use of about 1,690 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in South East All run by EcotricityNearby generating sites
- Pingewood Β· 15.4 MW solar farm0.9 km
- Pierces Farm Β· 1.74 MW solar farm3.3 km
- Sheepbridge Β· 5 MW solar farm4.1 km
- Burghfield Β· 50 MW open-cycle gas power station4.8 km
- Berry Court Β· 3.92 MW solar farm13.4 km
- Hill End Farm Β· 2.84 MW solar farm14.8 km
- Hungerford Β· 4.47 MW solar farm17.0 km
- Limberlost Β· 1.59 MW solar farm17.7 km
Also operated by Ecotricity
Ecotricity operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Ecotricity / Prudential
- Planning authority
- Wokingham
- Planning reference
- F/2004/1418
- Application submitted
- 17 March 2004
- Permission granted
- 28 July 2004
- Began operating
- 1 October 2005
- Capacity in planning record
- 2 MW
- Address
- Plot 12 , South Oak Way , Green Park , Reading , Berkshire, Berkshire
- REPD reference
- 3210
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.