Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown968461.1 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

968 projects · page 1 of 20
ProjectCapacityStageConnection siteFrom
Bute Hydrogen Project 1
Gas · Haldane Energy Project 1 Limited
4.8 GWScoping Trent Valley South Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
Drax BECCS
Demand (data centres, industry) · Drax Power Limited
3.9 GWScoping Drax 400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 2
Gas · Haldane Energy Project 2 Limited
3.6 GWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 3
Gas · Haldane Energy Project 3 Limited
3.6 GWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 5
Gas · Haldane Energy Project 5 Limited
3.6 GWScoping Teeside Connection Node B
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 6
Gas · Haldane Energy Project 6 Limited
3.6 GWScoping Cheshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Hinkley Point C
Nuclear · Nnb Generation Company (Hpc) Limited
3.3 GWScoping Shurton 400kV Substation
National Grid (England & Wales)
Jul 2030
Hornsea Power Station 4
Offshore wind · Orsted Hornsea Project Four Limited
2.6 GWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
Oct 2029
Portwind
Offshore wind · Se Portwind Ltd
2.5 GWScoping Chickerell 400kV Substation
National Grid (England & Wales)
Dec 2036
Eggborough CCGT - OCGT - BESS
Battery storage · Eggborough Power Limited
2.5 GWAwaiting Consents Eggborough 400kV Substation
National Grid (England & Wales)
Oct 2027
Bute Hydrogen Project 4
Gas · Haldane Energy Project 4 Limited
2.4 GWScoping Teeside Connection Node 2 C 132/400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 7.1
Battery storage · Haldane Energy Project 7 Limited
2.4 GWScoping Solent Connection Node C 400kV
National Grid (England & Wales)
Oct 2038
Aquind Interconnector
Interconnector · Aquind Limited
2.1 GWAwaiting Consents Lovedean 400kV Substation
National Grid (England & Wales)
Jun 2030
Gallos
Offshore wind · Corio Generation Limited
2.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Walpole Flexible Generation
Battery storage · Flexible Generation 1 Ltd
2.0 GWScoping Walpole 400kV Substation
National Grid (England & Wales)
Jun 2033
Eggborough CCGT - OCGT - BESS
Battery storage · Eggborough Power Limited
2.0 GWAwaiting Consents Eggborough 400kV Substation
National Grid (England & Wales)
Oct 2026
Berwick Bank Offshore Wind Farm C
Offshore wind · Berwick Bank C Limited
1.8 GWScoping Blyth 400kV Substation
National Grid (England & Wales)
Nov 2029
Carrington Lane BESS
Battery storage · Apatura Battery Ltd
1.8 GWScoping Daines 400kV Substation
National Grid (England & Wales)
Oct 2037
Alverdiscott
Interconnector · Xlinks 1 Ltd
1.8 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Aug 2030
Alverdiscott 2
Interconnector · Xlinks 1 Ltd
1.8 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Aug 2032
Continental Link
Interconnector · National Grid Interconnector Holdings Limited
1.8 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2035
Teeside MPI
Interconnector · National Grid Interconnector Holdings Limited
1.8 GWScoping Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
The Superconnection
Interconnector · Asc Energy plc
1.8 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2037
NatPower Enderby - Patford Bridge Green Energy Park
Battery storage · Enderby Energy Limited
1.8 GWScoping Derbyshire Connection Node G 400kV
National Grid (England & Wales)
Oct 2037
Hinkley Point C
Nuclear · Nnb Generation Company (Hpc) Limited
1.7 GWScoping Shurton 400kV Substation
National Grid (England & Wales)
Mar 2029
Springwell
Solar + storage · Springwell Energyfarm Limited
1.6 GWScoping Navenby 400kV Substation
National Grid (England & Wales)
Jun 2033
LionLink (EuroLink)
Interconnector · National Grid Interconnector Holdings Limited
1.6 GWScoping Friston 400kV Substation
National Grid (England & Wales)
Oct 2032
GT R4 Offshore Wind Farm
Offshore wind · Gt R4 Limited
1.5 GWScoping Weston Marsh 400kV Substation
National Grid (England & Wales)
Nov 2030
Hornsea Power Station 4
Offshore wind · Orsted Hornsea Project Four Limited
1.5 GWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
Oct 2028
Mablethorpe Storage
Battery storage · Theddlethorpe Flexible Generation Limited
1.5 GWScoping Lincolnshire Coastal Node 400kV Substation
National Grid (England & Wales)
Nov 2031
Merlin 2 Offshore Windfarm
Offshore wind · Offshore Wind Limited
1.5 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2031
Mona Offshore Wind Farm
Offshore wind · Mona Offshore Wind Limited
1.5 GWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Oct 2029
Morgan Offshore Wind Farm
Offshore wind · Morgan Offshore Wind Limited
1.5 GWScoping Penwortham 400kV Substation
National Grid (England & Wales)
Nov 2029
Morven A Offshore Wind Farm (Prev Phoenix 1A)
Offshore wind · Morven Offshore Wind Limited
1.5 GWScoping Hawthorn Pit 400kV Substation
National Grid (England & Wales)
Oct 2031
Nursling Flexible Generation
Gas · South Eng Flexible Generation Limited
1.5 GWScoping Nursling 400kV Substation
National Grid (England & Wales)
Oct 2038
Old Flatts Farm
Solar + storage · Net Zero One Ltd
1.5 GWScoping Brinsworth 400kV Substation
National Grid (England & Wales)
Oct 2035
SSE Celtic Sea 1
Offshore wind · Sse Renewables Offshore Windfarm Holdings Limited
1.5 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Torridge Offshore Wind Farm
Offshore wind · Gwynt Glas Offshore Wind Farm Limited
1.5 GWScoping Torridge Offshore Substation
National Grid (England & Wales)
Oct 2031
Celtic MPI
Interconnector · National Grid Interconnector Holdings Limited
1.5 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2037
Gridlink Interconnector
Interconnector · Gridlink Interconnector Limited
1.5 GWScoping Kingsnorth 400kV Substation
National Grid (England & Wales)
Mar 2029
Nautilus
Interconnector · National Grid Interconnector Holdings Limited
1.5 GWScoping Wallend 400kV Substation
National Grid (England & Wales)
Oct 2029
Western MPI
Interconnector · National Grid Interconnector Holdings Limited
1.5 GWScoping Connah's Quay 400kV Substation
National Grid (England & Wales)
Oct 2037
Dogger Bank D Offshore Wind Farm
Offshore wind · Doggerbank Offshore Wind Farm Project 4 Projco Limited
1.5 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2031
Dogger Bank South East
Offshore wind · RWE Renewables UK Dogger Bank South (East) Limited
1.5 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Nov 2031
Dogger Bank South West
Offshore wind · Rwe Renewables UK Dogger Bank South (West) Limited
1.5 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Nov 2031
Ferrybridge D
Hydro and pumped storage · Keadby Generation Limited
1.4 GWAwaiting Consents Ferrybridge C 275kV Substation
National Grid (England & Wales)
Jun 2034
Overton Solar & Storage Farm
Solar + storage · Elements Green Limited
1.4 GWScoping Overton 275kV
National Grid (England & Wales)
Jun 2032
Trafford 2 BESS
Battery storage · Future Point Manchester Limited
1.4 GWScoping Carrington 400KV Substation
National Grid (England & Wales)
Oct 2038
Cronos
Interconnector · Cronos Energy Ltd
1.4 GWScoping Kemsley 400kV Substation
National Grid (England & Wales)
Oct 2029
Low Carbon Link
Interconnector · Low Carbon Solar Park 39 Limited
1.4 GWScoping South Wales West Connection Node C 400Kv Substation
National Grid (England & Wales)
Oct 2037
Page 1 of 20

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.