πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· NGET

Overton Solar & Storage Farm

Overton Solar & Storage Farm is a 1.4 GW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Overton 275kV, with capacity due from June 2032. The connection agreement is held by Elements Green Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002175
Customer
Elements Green Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
1.4 GW
Change in this agreement
+1.4 GW
Capacity effective from
1 June 2032
Connection site
Overton 275kV
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Overton Β· Grid map

Other projects at Overton 275kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem