Grid infrastructure › Connection queue › Offshore wind
OFFSHORE WIND · NGETDogger Bank South East
Dogger Bank South East is a 1.5 GW offshore wind project in planning, connecting to the National Grid (England & Wales) network at Birkhill Wood 400kV Substation, with capacity due from November 2031. The connection agreement is held by RWE Renewables UK Dogger Bank South (East) Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Nov 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001375-2
- Customer
- RWE Renewables UK Dogger Bank South (East) Limited
- Technology
- Wind Offshore
- Total capacity
- 1.5 GW
- Change in this agreement
- +1.1 GW
- Capacity effective from
- 30 November 2031
- Connection site
- Birkhill Wood 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Other projects at Birkhill Wood 400kV Substation
- Continental LinkInterconnector · 1.8 GW · Scoping
- The SuperconnectionInterconnector · 1.8 GW · Scoping
- Dogger Bank D Offshore Wind FarmOffshore wind · 1.5 GW · Scoping
- Dogger Bank South WestOffshore wind · 1.5 GW · Scoping
- The SuperconnectionInterconnector · 1.0 GW · Scoping
- Dogger Bank South EastOffshore wind · 400 MW · Scoping
- Dogger Bank South WestOffshore wind · 400 MW · Scoping
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem