| Project | Capacity | Stage |
|---|---|---|
| Blackhillock Battery Battery storage Β· Blackhillock Flexpower Ltd |
349 MW | Consents Approved |
| Zenobe Blackhillock 300 MW Battery storage Β· Zenobe Blackhillock Limited |
300 MW | Consents Approved |
| MeyGen Tidal Battery storage Β· Meygrid Limited |
237 MW | Consents Approved |
| Rothienorman 50MW BESS Battery storage Β· Rothienorman Flexpower Ltd |
50 MW | Consents Approved |
| Corshellach Battery Energy Storage System Battery storage Β· Corshellach Energy Storage Limited |
50 MW | Consents Approved |
| Drum Farm Energy Storage Facility Battery storage Β· Field Drum Farm Ltd |
50 MW | Consents Approved |
| Lovat Estate BESS Battery storage Β· LG-B-50a Limited |
50 MW | Consents Approved |
| Meetlaw BESS Battery storage Β· Carravindoon Limited |
50 MW | Consents Approved |
| Overhill BESS Battery storage Β· Pulse Clean Energy Spv Watt Limited |
50 MW | Consents Approved |
| Coupar Angus Battery Battery storage Β· Coupar Limited |
40 MW | Consents Approved |
| Keith Battery Storage Battery storage Β· Field Keith Ltd |
39 MW | Consents Approved |
| Arbroath Battery Substation Battery storage Β· Arbroath Limited |
35 MW | Consents Approved |
| MeyGen Tidal Battery storage Β· Meygrid Limited |
28 MW | Consents Approved |
| Tarland Battery Storage System Battery storage Β· Tarland Limited |
20 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.