🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 8 of 46
ProjectCapacityStageConnection siteFrom
Ardleigh Solar & BESS
Solar + storage · Nembus BESS Limited
600 MWScoping Hadleigh 400kV Substation
National Grid (England & Wales)
Oct 2032
Bicker Fenn Energy Park
Solar + storage · Beacon Fen Energy Park Limited
600 MWScoping Bicker Fen 400kV Substation
National Grid (England & Wales)
Jun 2029
Braybrooke
Battery storage · Sse De Solar Holdco Limited
600 MWScoping Market Harborough 400kV Substation
National Grid (England & Wales)
Jul 2032
Brinsworth
Battery storage · Sse Renewables Solar & Battery Holdings Limited
600 MWScoping Brinsworth B 400kV Substation
National Grid (England & Wales)
Oct 2032
Caledonia Offshore Wind Farm
Offshore wind · Caledonia Offshore Wind Farm Limited
600 MWScoping Greens 400kV Substation
SSEN Transmission (north Scotland)
Mar 2031
Cerulean Winds INTOG 1
Offshore wind · Cerulean Winds Limited
600 MWAwaiting Consents Hurlie 400kV substation
SSEN Transmission (north Scotland)
Oct 2033
Chapel Rush Solar
Solar + storage · RWE Renewables UK Solar and Storage Limited
600 MWScoping North Humber Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2035
Chesterfield
Solar + storage · Sse Renewables Solar & Battery Holdings Limited
600 MWScoping Chesterfield 400kV Substation (Not yet constructed)
National Grid (England & Wales)
Oct 2032
Cottam Solar PV + BESS
Solar + storage · Cottam Solar Project Limited
600 MWConsents Approved Cottam 400kV Substation
National Grid (England & Wales)
Sep 2029
Cottered
Solar + storage · Littleton Pastures Solar Limited
600 MWScoping West Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2030
Crathorne Estate BESS and Solar Farm
Solar + storage · Exagen Development Limited
600 MWScoping Lackenby 400kV Substation
National Grid (England & Wales)
Oct 2035
Cruachan Expansion
Hydro and pumped storage · Drax Cruachan Expansion Limited
600 MWScoping Cruachan 275kV Substation
SP Transmission (south Scotland)
Oct 2030
Daines BESS
Battery storage · Sse Daines BESS Limited
600 MWScoping Daines 400kV Substation
National Grid (England & Wales)
Oct 2028
Dunstable
Solar + storage · Connectid 9 Limited
600 MWScoping West Anglia Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2034
Earba PSH
Hydro and pumped storage · Earba Limited
600 MWConsents Approved Earba PSH Powerhouse Substation
SSEN Transmission (north Scotland)
Dec 2032
Fancott
Battery storage · Kona Asset 2 Limited
600 MWScoping Sundon 400kV Substation
National Grid (England & Wales)
Oct 2031
Fiddlers Ferry BESS
Battery storage · Fiddlers Ferry Ltd
600 MWConsents Approved Fiddlers Ferry 275kV Substation
National Grid (England & Wales)
Oct 2028
Flinton Road
Solar + storage · Flinton Road Solar Limited
600 MWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
Oct 2039
Glenfiddich West
Wind + storage · Boralex Limited
600 MWScoping New North East Substation 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Harlaston
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Harlaston 400kV Substation
National Grid (England & Wales)
Oct 2033
Ironbridge
Solar + storage · Igp Solar 16 Limited
600 MWScoping Ironbridge 400kV Substation
National Grid (England & Wales)
Apr 2031
Letch Beck Energy Park
Solar + storage · Renewable Energy Systems Limited
600 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2033
LGB300
Battery storage · LG-B-300
600 MWScoping LGB300 400KV Substation
SSEN Transmission (north Scotland)
Jul 2031
Lightsourcebp Amlwch BESS and Hydrogen
Battery storage · Lightsource Renewable UK Development Limited
600 MWScoping Wylfa South 400kV Substation
National Grid (England & Wales)
Oct 2037
Lower Pool Energy Park
Solar + storage · Renewable Energy Systems Limited
600 MWScoping Derbyshire Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Neilston 400kV Greener Grid Park
Battery storage · Statkraft UK Ltd
600 MWConsents Approved Neilston 400kV Substation
SP Transmission (south Scotland)
Oct 2029
Newark BESS
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Coddington 400kV Substation
National Grid (England & Wales)
Sep 2033
Ninfield Green Energy Centre
Solar + storage · Ninfield Ng Limited
600 MWAwaiting Consents Ninfield 400kV Substation
National Grid (England & Wales)
Oct 2031
Oakley
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Oakley 400kV Substation
National Grid (England & Wales)
Nov 2038
Ossian 2 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
600 MWScoping Western Marsh 400kV
National Grid (England & Wales)
Oct 2031
Ossian 3 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
600 MWScoping Western Marsh 400kV
National Grid (England & Wales)
Oct 2033
Penwortham Green Energy Centre
Solar + storage · Penwortham NG Limited
600 MWAwaiting Consents Penwortham 400kV Substation
National Grid (England & Wales)
Oct 2035
Ranby
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Jubilee Farm 275kV Substation
National Grid (England & Wales)
Aug 2034
Rugeley
Solar + storage · Igp Solar 17 Limited
600 MWScoping Rugeley 400kV Substation
National Grid (England & Wales)
Aug 2031
Sandford
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping SANDFORD B 400kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Southery
Solar + storage · Sse Southery Solar Limited
600 MWScoping Southery 400kV Substation
National Grid (England & Wales)
Oct 2031
SSE Spittal Energy Park
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Spittal 400kV
SSEN Transmission (north Scotland)
Oct 2033
St Asaph SSE
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Nov 2037
Steeple Solar Farm
Solar + storage · Steeple Solar Farm Limited
600 MWScoping West Burton 400kV Substation
National Grid (England & Wales)
Oct 2029
West Haddon
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping West Haddon 400kV Substation
National Grid (England & Wales)
Oct 2039
Willington
Solar + storage · Sse Utility Solutions Limited
600 MWScoping Willington 400kV Substation
National Grid (England & Wales)
Oct 2029
Ratcliffe-on-Soar II
Solar + storage · Enso Green Holdings Limited
590 MWScoping Ratcliffe-On-Soar 400kV Substation
National Grid (England & Wales)
Oct 2033
Tween Bridge Solar Park
Solar + storage · RWE Renewables UK Solar and Storage Limited
590 MWScoping Trent Valley North Connection Node B 400kV Substation
National Grid (England & Wales)
Nov 2032
Beatrice Wind Farm
Offshore wind · Beatrice Offshore Windfarm Limited
588 MWBuilt Beatrice 400kV Substation
SSEN Transmission (north Scotland)
East West Interconnector
Interconnector · Eirgrid Interconnector Designated Activity Company
585 MWBuilt Deeside 400kV Substation
National Grid (England & Wales)
Navenby GEC (Ethos Green)
Solar + storage · Navenby Green Energy Centre Ltd
580 MWAwaiting Consents Navenby 400kV Substation
National Grid (England & Wales)
Oct 2033
Gwynt Y Mor Offshore Wind Farm
Offshore wind · Gwynt Y Mor Offshore Wind Farm Limited
574 MWBuilt Gwynt y Mor 132/33kV Offshore Substation
Offshore transmission owner
Race Bank Wind Farm
Offshore wind · Race Bank Wind Farm Limited
565 MWBuilt Race Bank 132kV Substation
National Grid (England & Wales)
Green Volt Offshore Windfarm
Offshore wind · Green Volt Offshore Windfarm Ltd
560 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Market Harborough GEC (Ethos Green)
Solar + storage · Market Harborough Green Energy Centre Ltd
560 MWAwaiting Consents Market Harborough 400kV Substation
National Grid (England & Wales)
Oct 2032
Page 8 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.