Grid infrastructure › Connection queue › Hydro and pumped storage

HYDRO AND PUMPED STORAGE · SPT

Cruachan Expansion

Cruachan Expansion is a 600 MW hydro and pumped storage project in planning, connecting to the SP Transmission (south Scotland) network at Cruachan 275kV Substation, with capacity due from October 2030. The connection agreement is held by Drax Cruachan Expansion Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2030 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001889
Customer
Drax Cruachan Expansion Limited
Technology
Pump Storage
Total capacity
600 MW
Change in this agreement
+600 MW
Capacity effective from
31 October 2030
Connection site
Cruachan 275kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Cruachan · Grid map

Other projects at Cruachan 275kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem