Grid infrastructure › Connection queue › Hydro and pumped storage

HYDRO AND PUMPED STORAGE · SPT

Cruachan U3&4 Replacement

Cruachan U3&4 Replacement is a 480 MW hydro and pumped storage project consented, connecting to the SP Transmission (south Scotland) network at Cruachan 275kV Substation, with capacity due from April 2029. The connection agreement is held by Drax Pumped Storage Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2029 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000113-2
Customer
Drax Pumped Storage Limited
Technology
Pump Storage
Total capacity
480 MW
Change in this agreement
+40 MW
Capacity effective from
4 April 2029
Connection site
Cruachan 275kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Cruachan · Grid map

Other projects at Cruachan 275kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem